
<rss version="2.0">
<channel>
<title>Extensions MEP Newsletter</title>
<description>Trimble's informative and Educational Newsletter for MEP contractors</description>
<link>http://www.extensionsmep.com</link>
<copyright>COPYRIGHT 2012, TRIMBLE NAVIGATION LIMITED</copyright>

     <item>
        <title> Trimble Field Fitting Input: A Revolution in Sheet Metal Fitting</title>
        <description>

Tired of getting your field drawings on sheetrock, cardboard, or scraps of paper? Looking to reduce waste in the shop from all the</description>
        <link>http://www.trimbleextensions.com/qn/quickpenquicknotes/</link>
        <pubDate> Thu, 26 Apr 2012 11:50:43 EDT</pubDate>
     </item>
     
     
     <item>
        <title> A General Contractors View to MEP Model Coordination</title>
        <description>A General Contractors View to MEP Model Coordination…As implemented on the Trimble Westminster Building Project

The new 125,000 sq. ft. Trimble Westminster Building project in Westminster, Colo., set to break ground by the end of April, provides</description>
        <link>http://www.trimbleextensions.com/spec/thespecialist/a-general-contractors-view-to-mep-model-coordination</link>
        <pubDate> Wed, 25 Apr 2012 11:07:24 EDT</pubDate>
     </item>
     
     
     <item>
        <title> Version 11 – Overview of Enhancements</title>
        <description>This article covers some of the enhancements that have taken place within Version 11 of Accubid Estimating.  Any user can always refer to the help menu of their program to view the complete list of enhancements</description>
        <link>http://www.trimbleextensions.com/t_c/trainerscorner/version-11-–-overview-of-enhancements</link>
        <pubDate> Wed, 25 Apr 2012 11:06:52 EDT</pubDate>
     </item>
     
     
     <item>
        <title> Change Order Protocol Part II</title>
        <description>Introduction

In last month’s Extensions, I introduced a change order protocol that was drafted by the Toronto Trade Association Standard Practice Committee, along with a taskforce made up of electrical, mechanical and sheet metal Contractors, as well</description>
        <link>http://www.trimbleextensions.com/i_i/industryinsights/change-order-protocol-part-ii</link>
        <pubDate> Wed, 25 Apr 2012 11:06:25 EDT</pubDate>
     </item>
     
     

</channel>
</rss>
